sewer water
英
美
[网络] 下水道
双语例句
- When the auxiliary sewer line stores the waste water, the waste water can be pumped into the water storage tank through the water suction pipe by the self-sucking pump.
当副下水管道储存有废水时,自吸泵可将废水经抽水管抽至储水箱内。 - Open diversion canal and urban sewer network are two important systems of open water systems.
明渠引水系统和城市排水系统是明渠水系的两类重要系统。 - Considering the township economy development and technical progress in this area, the suitable sewer system and receiving water bodies of wastewater were discussed.
结合漓江流域城镇经济、技术水平特点,对流域的城镇排水的体制、出路进行了分析; - The sewer is silted up by foulness, and the waste water is everywhere on the ground.
下水道被脏物阻塞了,污水流得满地都是。 - The construction document stage of water system design, including the water supply, hot water supply, sewer, rainwater drainage, air condition condensation, fire control water and automatic sprinkling system are presented.
介绍了工程概况、给水系统、热水系统、排水系统、雨水及空调冷凝水系统、消火栓灭火系统、自动喷水灭火系统的施工图设计要点,及灭火器配置的设计。 - This paper introduces the characteristics of combined sewer system in urban areas and the bad effects on water environment of this system as well as the remaking methods of combined sewer in connection with these effects.
介绍了城市旧合流制排水系统的特点,论述了其对环境的影响,提出针对这些不利影响所采取的旧合流制排水系统改造的方法和途径。 - At the same time, study on the relation between them needs calculating quantitatively Combined Sewer System Overflow ( CSO) spill volume 、 time and water quality and study the self-purification of contamination in receiving water.
研究截流倍数与水体环境质量之间的关系,则需要定量计算合流制排水系统的溢流水量、水质以及溢流时间,并在此基础上研究溢流污水在水体中的净化过程。 - Under experimental conditions, when initial contents of Hg and Pb reach the water quality standards for municipal sewer sewage, the removal efficiency is beyond 70%, and the effluent can reach the water quality standards for agricultural irrigation.
在试验条件下,当汞和铅的原水浓度达到污水排入城市下水道水质标准时,去除率在70%以上,出水满足农业灌溉水质标准。 - That connects to a sewer that takes the sewage to one of the Bloomington-Normal Water Reclamation District treatment plants.
控制阀和一个污水管连接,把污水排入地区日常水处理工厂。 - In order to simulate as exactly as possible the actual sit ation of the flow in combined sewer during storm, the unsteady flow simulation is used to check the capability of the existing drainage networks to carry storm water and find out the overloaded pipes.
为了尽可能精确地模拟暴雨情况下合流制排水管网水流的实际情况,采用非恒定流模拟技术对现有管网的实际过水能力进行校核,查找出超载管段。
